Register / Login

Loading...

Metro of Bogota First Line - First tranch

Sectors

Infrastructure

Description:

Projects in this Sector: 658

Browse Projects

Issues Raised

Consultation and disclosure

Description:

Projects with this Issue Raised: 555

Browse Projects

Displacement (physical and/or economic)

Description:

Projects with this Issue Raised: 520

Browse Projects

Due diligence

Description:

Projects with this Issue Raised: 486

Browse Projects

Livelihoods

Description:

Projects with this Issue Raised: 365

Browse Projects

Other

Description:

Projects with this Issue Raised: 235

Browse Projects

Property damage

Description:

Projects with this Issue Raised: 170

Browse Projects

Project Information

Investment ID: 4572/OC-CO,

Bank: Inter-American Development Bank

Environmental Category: A

Country: Colombia

Region: Latin America and the Caribbean

Approval Date: Aug. 6, 2018

Investment Types: Loans

Total Project Cost: USD 196.0 million

Total Complaints: 14

Description

The objective of the project is to improve the transportation system of the Metropolitan Region of Bogotá in order to meet the needs of the growing demand by increasing the quality and supply of massive urban transport infrastructure. The latter will seek higher levels of mobility, connectivity, security and comfort, contributing to generate better living conditions of the population in the area of influence and the reduction of greenhouse gas emissions. The specific objectives, among others, are the increase of the number of passengers mobilized, a better access to work sources, the reduction of operating costs and the reduction of journey time for public transport users.

Related Complaints

Inter-American Development Bank MICI Complaints IAM Country Date Filed Status
Metro of Bogota First Line - First tranch IDB MICI Colombia 06/08/2020 Closed Without Outputs
Metro of Bogota First Line - First Tranch - Request III IDB MICI Colombia 14/12/2021 Closed Without Outputs
Metro of Bogota First Line - First Tranch - Request IV IDB MICI Colombia 15/02/2022 Closed With Outputs
Metro of Bogota First Line - First Tranch - Request IX IDB MICI Colombia 14/02/2023 Closed Without Outputs
Metro of Bogota First Line - First Tranch - Request V IDB MICI Colombia 12/08/2022 Active
Metro of Bogota First Line - First Tranch - Request VI IDB MICI Colombia 19/08/2022 Closed Without Outputs
Metro of Bogota First Line - First Tranch - Request VII IDB MICI Colombia 19/08/2022 Closed Without Outputs
Metro of Bogota First Line - First Tranch - Request VIII IDB MICI Colombia 29/11/2022 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request X IDB MICI Colombia 04/10/2023 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request XI IDB MICI Colombia 24/10/2023 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request XII IDB MICI Colombia 02/01/2024 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request XIII IDB MICI Colombia 03/01/2025 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request XIV IDB MICI Colombia 23/01/2025 Closed Without Outputs
Metro of Bogota First Line - First Tranch — Request XV IDB MICI Colombia 09/02/2026 Closed Without Outputs

Implementers

Name Complaints Dispute Resolutions DR Successful Compliance Reviews Non-Compliance
Empresa Metro de Bogotá (EMB)